Phase 4B Port Facilities at Onne Port Complex

About This Project

[vc_row css_animation=”” row_type=”row” use_row_as_full_screen_section=”no” type=”full_width” angled_section=”no” text_align=”left” background_image_as_pattern=”without_pattern” css=”.vc_custom_1492520313265{padding-top: 8px !important;padding-bottom: 10px !important;}”][vc_column][vc_column_text]

REHABILITATION OF FEDERAL LIGHTER TERMINAL (FLT 1 JETTY), ONNE, PORT-HARCOURT

Client          –         Nigerian Ports Authority

Details         –        This project involves rehabilitation of the Federal

                                Lighter Terminal 1 Jetty.

The rehabilitation project involves:-

  • Re-establishment of the shoreline, steel sheet pile protection wall at 1m into the water from the existing.
  • Replacement of the stelcon plates with 15m deck on pile apron.
  • Reconstruction of next 15m apron using stelcon plates but on well strengthened bed.
  • Provision of fenders and bollards.

  FAST TRACKING OF THE PHASE V FACILITIES DEVELOPMENT AT ONNE PORT COMPLEX, PORT HARCOURT

Client          –         Nigerian Ports Authority

Details         –         The project involves:-

  • Evaluation of Engineering Design and Drawings
  • Supervision of the works, including closely monitoring of same to ensure that the development is done to the approved specifications and in line with the best engineering practice.

PROJECTS FOR PORTS STANDARDIZATION, ONNE, PORT-HARCOURT

Client           –         Nigerian Ports Authority (NPA)

Details         –         This project involves the complete re-design of rigid carriage roads and associated facilities within Onne Port Complex and the preparation of Contract Documents.

Projects involved are:-

  • Design and Supervision of Main Gate and Access Control Roads.
  • Design and supervision of Internal Roads A, B, C,D, E, I1, I2 and I3

 